Deep Foundation Underpinning

Micro Piling and Rock Anchoring

Rotary hydraulic rigs boring 100mm to 300mm cased micro piles and prestressed multi-strand rock anchors inside restricted urban basements.

Execution Sequence

Engineered Substructure Protocol

01
02
03
04

Rotary Percussive Drilling

Reinforcement Placement

Colloidal Pressure Grouting

Hydraulic Tensioning

Calibrated multi-strand jacks stress anchors beyond working load limits before wedge-locking into heavy structural bearing plates.

Down-the-hole hammer tooling advances through overburden and hard rock strata to verified refusal depth without destabilizing adjacent foundations.

High-tensile steel reinforcement cages or unbonded multi-strand prestressed tendons are lowered to design depths with centralizers intact.

High-pressure neat cementitious grout injection fills the borehole from the bottom up, displacing groundwater and bonding anchor zones.

Geotechnical Verification

Tensile Proof Load Testing

Every prestressed rock anchor undergoes cyclic hydraulic proof testing against basalt and granite bedrock to confirm design hold capacity before structural lock-off.

Real-time dial gauge deflection logs verify borehole bond strength, eliminating grout creep and securing deep basement diaphragm walls against lateral hydrostatic pressure.

Submit Borehole Logs and Drawings

Dispatch engineering teams review site strata and load schedules to specify rig clearance, anchor depths, and mobilization timelines.